Rivneazot has completed the construction of its electricity generation facility, and 100% loading of production capacities has been achieved. The enterprise can now produce up to 30 MW/h of electricity. In addition, by importing electricity Rivneazot was able to launch a second unit to produce…
A large fertilizer producer has built its own 30 MW power generation plant and loaded production at 100%.
by
Tags:
Leave a Reply